25 Holly Drive

Newington, CT

Building

Avison Young is pleased to present this 60,480 SF Data Center on 2.5 acres available at 25 Holly Drive in Newington, CT. This property is now available for sale or lease. 25 Holly Dr. comes with significant power capacity, making it the perfect site for energy-intense users.

Electrical/Mechanical Specifications

2500 KVA Transformer (Eversource has indicated service can be increased to 10,000 KVA)

4000 AMP & 3000 AMP Switchgear

17 Cap Stone Micro Turbines

2 Liebert 1000 KVA UPS Systems

2000 KVA Generator With Day Tank

930 KVA Generator With Day Tank

4000 Gallon Fuel Oil Tank
2 150 Ton ABS Chillers Primary Source

4 30 Ton Carrier Chillers Redundant Source

10 AHU Liebert CRAC Units For Data Center

20 DX Liebert CRAC Units For Data Center

2 10 DX Liebert CRAC Units For UPS Room

AHU Liebert for UPS Room

Carrier Web Control BMS System

Availabilities

Available

1st Floor

Space Type

Industrial

Total Size

60,480 sqft

available

1st Floor

Total Size

60,480 sqft

Space Type

Industrial

Downloads

25 Holly Drive Brochure

Team

Jonathan Vacca

Jonathan Vacca

Vice President
Avison Young
617.620.9403
Howard Berry

Howard Berry

Principal, National Data Center Solutions
Avison Young - US - CA - Silicon Valley
CA Lic. No. 01795693
+1 408 913 6931

Please Use the Form Below for Further Information:


We will not send you spam or share your email address.