Property Overview

+/- 200 MW Behind-the-Meter Data Center Campus | First Power in 18 Months

+/- 200 MW behind-the-meter capacity, expandable. On-site gas-fired generation, engineered to a conceptual design basis. No ERCOT interconnection queue, no transmission cost allocation, no curtailment exposure.


Gas supply well in excess of Phase 1 requirements. Two large-diameter interstate transmission lines cross the property. Interconnect scoping underway with both operators.


First power within 18 months of NTP. Phased delivery, with additional capacity available on the same fuel supply.


No zoning, city, or county restrictions. Outside all municipal and ETJ jurisdiction — no rezoning, platting, or use permits required.


Low-water cooling design. Closed-loop architecture supported by a dedicated on-site groundwater program.


Carrier fiber +/- 2 miles. Multiple national routes along I-35, with estimated sub-1 ms latency to Austin and sub-5 ms to Dallas.


+/- 205.98 contiguous acres at 4801 County Rd. 239, Jarrell, TX — flat, clear, and under seller control.

Direct I-35 frontage corridor

45 minutes to Austin
Central Texas power and fiber corridor

Downloads

North Austin Data Center - Flyer

North Austin Data Center - CA

Team

Darrell L. Betts, CCIM
Darrell L. Betts, CCIM
Principal, Capital Markets
Avison Young - US - TX - Houston
Jessica S. Alexander
Jessica S. Alexander
Project Coordinator, Capital Markets
Avison Young - US - TX - Houston
Austin Stacey
Austin Stacey
Financial Analyst
Avison Young - US - TX - Houston